Date
on:-11th July 2012
Eng'r Aiman Abrahym
Project Manager
Salman Al-Terais & Partners Limited
Construction Co.
Project of Society College (Al-Aflaj)
From
# Bablu Sharma
Salman
Al-Terais & Partners Limited Construction Co. (Store-Coordinator)
Daily
Report
1.
Weather Condition
Morning: - Window Afternoon: - Sandstorm
Evening:-Sandstorm
2.
Manpower Availability
Supervisor
|
3
|
Carpenter
|
20
|
Electrician
|
60
|
Foreman
|
3
|
Mason
|
20
|
Plumber
|
12
|
Steel man
|
50
|
Labor
|
50
|
Painters
|
40
|
Operator
|
10
|
Utility Man
|
1
|
Transmits
|
----------
|
3.
Construction Activates:
(Structural, sanitary, Electrical, Mechanical,
Architecture, Etc.)
A.
Structural
A.1 Space
Frame by PRISMA CONTRACTOR
B.
Sanitary
C.
Electrical
D.
Mechanical
E.
Architecture
E.1 Granite:
Grand Floor Part D, Roof Top: Part A, B, C, D, E
By Sub
Contractor
E.2 Porcelain:
Grand 1st, 2nd
E.3
Masonry: Grand 1st, 2nd
E.4
Plastering: Grand, 1st Part A, B, C, D, and E 2nd: Part A, B, C, D,
and E
E.5 Painting:
Grand, 1st Part A, B, C, D, and E 2nd: Part A, B, C, D, and E
E.6 Window:
Grand, 1st Part A, B, C, D, and E 2nd: Part A, B, C, D, and E
4. Equipment Utilization
A.
Shewell Hyundai (HL 760-7) (Yellow)
B.
Shewell KLD 702-0530 (Green)
C.
JCB
D.
Bobcat 753 UL70
E.
Bobcat (Not Working)
F.
2-Crane Operator
G.
Water Truck Delivery
5. Correspondence
Paint:
Al-Jazeera Inter primer (White) = 100 Gallon
6. Agreement, Decision Made